i choose 4 x 10, that extra day off really does help out and gives me more time to rest. sucks that most american jobs rather do it the 5 days a week gig
4x10 is pretty solid
0x0 work weeks
Answer = 40
I work a 4x10 from 7-5 and it’s awesome
4x10 with optional OT is the best of all situations tbh
4x10s is cake
4x10 def
3x12 > 4x10 > 5x8
5x8 is nasty ass work. Never in my life would I ever work 5x8. I wouldn’t even do 4x10 but if that’s the best option in your field then take it.
3x12 > 4x10 > 5x8
5x8 is nasty ass work. Never in my life would I ever work 5x8. I wouldn’t even do 4x10 but if that’s the best option in your field then take it.
Imagine a world where game dev jobs are split into two & two people work 3 X 12 instead of one person being demolished working 6 X 12 (sometimes 6/7 X 12/14) during crunch
Y'all making me consider 4x10..
4x10
Imagine a world where game dev jobs are split into two & two people work 3 X 12 instead of one person being demolished working 6 X 12 (sometimes 6/7 X 12/14) during crunch
All jobs should be 24 hour jobs with rotating 12 hour shifts and open and running 24 hours per day
So much productivity, way more economic action generated, night shifters can access all business on their off nights because everything is still running, everyone gets 4 days/nights off a week
Would be vicious
All jobs should be 24 hour jobs with rotating 12 hour shifts and open and running 24 hours per day
So much productivity, way more economic action generated, night shifters can access all business on their off nights because everything is still running, everyone gets 4 days/nights off a week
Would be vicious
Not enough people would want to work the night shift
I’m 7 x 24 on KTT
4x10 easy
3 days off makes me never even consider calling off cuz I’m tired or just don’t feel like going in to work like 2 days off did
2x20 the sweet spot
I love 4x10 it’s not even a debate
I do 4x12 then off 4.
Not enough people would want to work the night shift
If you make night shift differential meaningful then they would IMO
A solid 20% added to base salary for nights people would be down
I wish. Work week should be 4 days.
Not 5. Weekends go by so fast. And you really only get 1 full day to yourself since on Sunday, you anticipate going back to work the next day, and generally need to go to bed earlier than on Friday
was 4x10 my last job is was dope
now I'm 5x10 and it's a whole different world lmao